top of page
COMPETITION POOL RECONSTRUCTION
SPRAIN RIDGE PARK
Yonkers, NY
1.jpg

Client:

County of Westchester

Department of Public Works

Project Amount:

$8 Million

Size:

Building - 17,700 SF

Activity Pool – 10,000 SF (177,000 Gal)

Spray Ground – 2,300 SF (7,660 Gal)

Pool Deck – 28,000 SF

 

Scope of Work:

Demolition, Excavation, Asbestos Abatement, PCB removals, Cast-In-Place Concrete, Shotcrete, Interior and Exterior Demolitions and Renovations, Minor Structural Repair, Bathroom Renovations, Millwork PVC Benches, Interior Finishes & Equipment, Canopies, Mechanical HVAC, Plumbing Repairs and Upgrades, Water Meters, RPZ and PRV Installation, Electrical Infrastructure, Electrical Services, Lighting and Emergency Fixtures, Fire Alarm, Asphalt Paving, Zero Entry Activity Swimming Pool and Children’s Aquatic Spray ground, Storm, Sewer, and Water Utilities.

Project Description:

The project consisted of the revitalization of the dilapidated 50 year old Sprain Ridge Pool Bath House and existing pools which were neglected for more than half a decade.  The scope of work within the interior and exterior of the building quickly grew as many areas of the building were discovered to be either rotted or destroyed by insects over the years.  The building roof was in dire condition and dictated that the entire roof was to be replaced with many of the areas of the roof were rotted.  Throughout the duration of the project many aspects of the construction were evolving and changing as both New York State Department of Health and Westchester County Department of Health changed many aspects of the swimming pools in order to comply with the very stringent health code requirements.  ELQ coordinated and managed every aspect of the project in a way that enabled them to effectively and efficiently complete the project within the contract schedule despite the continued evolution in the scope of the project.

bottom of page